# How does the project gauge work?

* You can also find the hours worked in the submenu of each construction site in the [Timesheets](https://www.alobees.com/en/fonctionnalites/feuilles-d-heures) tab.
* A progress gauge is present on the sheet of each construction site.

![](https://storage.crisp.chat/users/helpdesk/website/b28a28d942b2c800/image_8dfyk5.png)

* The green corresponds to the hours planned and realized on D-1.
* The yellow corresponds to hours planned but not yet performed.
* The grey corresponds to the remaining time available for planning.

![](https://storage.crisp.chat/users/helpdesk/website/b28a28d942b2c800/image_1pf1d8m.png)

* Red is the time achieved in addition to the estimated time.
* Orange corresponds to the time planned on a construction site when the expected time has already been exceeded.